| Notes: Musgrave was a small rural halt serving farms and a few houses that made up the hamlets of Great and Little Musgrave. The station had a single platform with the stationmaster's house and a brick station building on the down side. There was a single siding with a loading dock and coal deport to the south of the station on the down side of the line. A ground frame controlled access to the goods yard. Musgrave was the first station in the area to close, closing on the 3rd November 1952, one month before than the intermediate stations between Kirkby Stephen East and Tebay closed. 
 BRIEF HISTORY OF THE DARLINGTON TO TEBAY LINE (STAINMORE) & THE KIRKBY STEPHEN TO CLIFTON LINE (EDEN VALLEY)
 From 1832 there were numerous proposals to build a branch  line from Barnard Castle to the Stockton & Darlington Railway but  these met stiff opposition from successive Dukes of Cleveland who owned most of  the land around Barnard   Castle. Eventually a Bill  was approved in 1854 for a line from a junction with the S & D at  Darlington to Barnard   Castle.
 The line was built by the Darlington  and Barnard Castle Railway opening on 9th July 1856 with intermediate stations  at Broomielaw, Winston, Gainford and Piercebridge.  In 1856 the South Durham & Lancashire Union Railway was  formed with the object of building a freight line from Bishop Auckland to Barnard Castle  and across the Stainmore summit in the Pennines  to Tebay on the Lancaster & Carlisle Railway. This is a sparsely populated  area and initially there were no proposals for a passenger service, the  proposed line would carry iron ore from Barry in Lancashire  to the blast furnaces of Teesdale while in the opposite direction coke and coal  were carried to the iron ore mines which had flourished in the Furness district  of Lancashire. The Act for the construction of this line which by now included  a passenger service, encountered practically no opposition and the Royal Assent  was granted on 13th July 1857 with work starting at Kirkby Stephen  six weeks later.  Despite the difficult terrain, progress on the 35 mile line  between Barnard Castle  and Tebay was rapid and this section opened to mineral traffic on 4th July 1861  with the passenger service commencing from a second terminus at Barnard Castle on 8th August 1861 with  intermediate stations at Lartington, Bowes, Kirkby Stephen, Smardale,  Ravenstonedale and Gaisgill. A sixth station at Barras was initially freight  only first appearing in the passenger timetable in February 1862. The remaining  section of the Lancashire Union line between Barnard Castle  and Bishop Auckland was opened to passenger traffic on 1st August 1863. The line included a number of major engineering features mostly notably the 1040 foot 16 span Belah metal viaduct. In the meantime, the Eden Valley Railway Company was formed  in 1856 to build a line from a junction with the Lancashire Union at Kirkby  Stephen to a junction with the Lancaster & Carlisle Railway at Clifton with intermediate  stations at Musgrave, Warcop, Appleby, Kirkby Thore, Temple Sowerby &  Cliburn. Construction started on 4th August 1858 and the line was opened for  mineral traffic on 8th April 1862 and to passengers on June 1862. A further  intermediate station was added at Clifton on 1st  August 1863 and a junction with the Midland Railway's Settle - Carlisle line was provided 500 yards north of Appleby  Station. The two stations at Barnard Castle  were some distance apart necessitating a long walk. To alleviate this, trains  from Darlington were diverted into the  Lancashire Union station on 1st May 1862 and on the same day the original  terminus was closed to passengers but remained open for freight until 5th April  1965. Both the Lancashire Union and the Eden Valley  lines were worked by the Stockton & Darlington Railway from the outset and  that company took them over on 30th June 1862, only to be swallowed by the  North Eastern Railway on 13th July 1863. The timetable for September 1961 showed only two trains in  each direction between Darlington and Tebay and the line always struggled to  attract many passengers beyond Barnard   Castle; at the turn of  the century before motor busses reached the area several of the smaller  stations were unable to run at a profit.Apart from the regular passenger service a number of  excursions used the line including   summer Saturdays only trains between the north-east coast and Blackpool  and an unusual service which lasted until the lines closure was an unpublicised  passenger train once every  two weeks,  normally on a Friday. This was The National Union of Mineworkers train from Durham to Ulverstone  carrying injured and sick miners to their convalescent home at Conishead  Priory.  Its normal route was Durham, Bishop Auckland, Barnard Castle,  Kirkby Stephen and Tebay. When opened, the lines from Barnard Castle to Tebay and  Kirkby Stephen to Penrith were both single, but sufficient land was purchased  to enable a double line to be constructed if required and on the Lancashire  Union all but three of the viaducts were built to take double track. With the  growth of freight traffic much of this line was doubled in stages between 1867  - 1874 and on the Eden   Valley the sections  between Appleby Station and Appleby Junction, and Clifton Moor to Eden Valley  Junction were doubled. The three viaducts were eventually rebuilt. Locomotive sheds were opened at Kirkby Stephen and Tebay in  1861 (Tebay closed 1902), each holding two engines. That at Kirkby Stephen was  enlarged 1865 and again in 1867 (Closed 1961). A further shed at Barnard Castle shed was authorised in 1864, and  extended in 1875 (closed 1937).  By 1910 the service had improved with seven trains in each  direction on weekdays between Darlington and Barnard Castle,  three of these running through to Tebay and Penrith; forty years later, under  BR, the service was virtually the same. For many years the 196 foot high Belah  Viaduct had a stringent weight restriction imposed on  it, this led to most of the heavier trains  being double headed by smaller locomotives and in BR days West Auckland  shed  had Standard Class 3 2-6-0’s  specially allocated for Stainmore freights and excursion passenger trains.  After WW2 a programme of passenger closures began. The first closures were   between Kirkby Stephen East and Tebay which lost its intermediate stations from   1st December 1952. From that date Smardale and Gaisgill stations  were closed completely, but Ravenstonedale remained open for freight. On the Eden Valley  line, Musgrave was closed completely on 3rd November 1952 and Kirkby Thore on  7th December 1953. Temple   Sowerby was closed to  passengers on the same day but remained open for freight while Cliburn was  closed completely on 17th September 1956. Between Barnard Castle  and Kirkby Stephen East, Barras was converted to an unstaffed halt (and closed  to freight) from 1st December 1952, and Lartington similarly from 2nd February  1953. Despite these closures the line was still a popular summer  excursion route between the north east and Blackpool  and there was still considerable east-west freight traffic although the  industries served were now in decline. Through the 1950’s the coal and coke  trains from the North East often had as many as 30 wagons hauled by three  locos; a double-header and a banker.  Diesel multiple units were introduced between Darlington and  Penrith on 3rd February 1958 and with the increased speed now possible over the  Stainmore summit there were suggestions that the service should be improved  with through trains running from the North East to Keswick but the following  year rumours began to circulate about a withdrawal of the passenger service  between Barnard Castle and Penrith after services were cut.  On the 9th of December 1959 passenger numbers were described  as "disappointing" despite an increase in passenger revenue and total  closure was announced of the line between Tees Valley junction (one mile west  of Barnard Castle) and Merrygill (one mile east of Kirkby Stephen East) and  from Appleby East to Clifton Moor. The remaining section of the line was to be  retained for freight traffic From Merrygill to Appleby East and between Eden  Valley Junction to Clifton Moor. The line east of Kirkby Stephen East and Tebay  would also remain open as far as Hartley Quarry.  This proposal included the withdrawal of passenger services  from the remaining stations at Lartington, Bowes, Barras, Kirkby Stephen East,  Warcop, Appleby East, and Clifton Moor, and the closure of the goods depots at  Bowes, Ravenstonedale and Temple   Sowerby. Restricted goods  facilities would still be provided at Kirkby Stephen East, Warcop, Appleby East   and Clifton Moor would become an unstaffed goods depot. There was a spirited  campaign and petition to keep the lines open but following prolonged  deliberation approval for the closures was given by the Minister of Transport  on 7th December 1961. The North Eastern and London Midland Regions of British  Railways moved quickly, and only twelve days later they announced that the last  trains would run on January 20, 1962. 
 Normally the last passenger train would have been the 8.30  p.m. diesel from Penrith to Darlington, but the Railway Correspondence &  Travel Society had arranged for a special steam-hauled train, conveying  enthusiasts and others on that day and this was actually the last train  conveying passengers to run between Penrith, Kirkby Stephen and Barnard Castle. The train started at Darlington  and ran through to Tebay with photo stops at Kirkby Stephen East and  Ravenstonedale, it then returned to Kirkby Stephen East before continuing to Carlisle. It returned after the last passenger train from  Penrith arriving back at Darlington around  midnight.
 The line between Tebay to Hartley Quarry remained open until  the end of 1963 after which date the quarry could still be reached via the  junction with the Settle – Carlisle line at  Appleby , this line also continued to serve Brough Quarry the army ranges at  Warcop. Track lifting across the Stainmore summit began almost immediately. Although the line between Darlington and Barnard Castle  remained open as part of the branch to Middleton in Teesdale it was only a  temporary reprieve as this too was quickly proposed for closure under the  Beeching cuts closing to passengers on 30th November 1964 and to goods on 5th  April 1965; the track was lifted shortly after closure.  The line from Appelby to Hartley Quarry remained in use  until October 1974 and it was then cut back to Warcop. The six miles of track  between Abbleby and Warcop remained in use until 6th March 1989 and today the  track still remains in place. The Eden Valley Railway Society was formed in 1995 with the  aim of reopening this remaining section of line and the first passenger trains  started running north from Warcop in 2006. In 1996 Kirkby Stephen East Station  was acquired by the Stainmore Railway Company which is working to develop the  site as a Heritage Centre and working railway representing the early  1950’s.  The eventual aim of both  societies is to reinstate a passenger service between Kirkby Stephen East and  Appleby East. Today much of the route over Stainmore is intact although  the viaducts at Belah, Deepdale and Tees have  been demolished. Near Kirkby Stephen the Merrygill and Podgill Viaducts were  restored by the The Northern Viaduct Trust  in the  1990's forming part of a circular walk which follows the trackbed between  Kirkby Stephen East and Hartley Quarry. Sources: Railway Magazine - April 1962 'Over Stainmore Summit' by K. Hoole. Railway Magazine - August 1989 'Stainmore the echoing silence' by Peter Hill. Cumbria Railways web site and Roy Lambeth. Tickets from Michael Stewart.  Other web sites: Eden Valley Railway Trust, aerial pictures of the Eden Valley line on WWW.VisitCumbria.com & Stainmore Railway Company  Further reading: The Stainmore & Eden Valley Railways by Peter Walton - Oxford Publishing Co. 1992 - ISBN 0-86093-306-7 & The Eden Valley Railway by Robert Preston - Oakwood Press 1997 ISBN 978-0853614869  To See other stations on the Darlington - Tebay line click on the station name: Darlington North Road, Piercebridge, Gainford, Winston, Broomielaw, Barnard Castle (1st), Barnard Castle (2nd), Lartington, Hulands, Bowes, Barras, Kirkby Stephen East, Smardale, Ravenstonedale, Gaisgill & Tebay. For the Eden Valley Line see  Warcop, Appleby East, Kirkby Thore,
 Temple Sowerby, Cliburn & Clifton Moor. See also Clifton & Lowther.
 
 |