SALTLEY LOCOMOTIVE SHED[Source: Terry Callaghan]
TLocated alongside the coaling stage was a mechanised ash plant, ash would be loaded directly into the 16 ton mineral wagon directly below the tower removing the need for men to manually shovel tons of ash and clinker into such wagons for disposal. Home Page
|