| Notes: Crymmych Arms station was the busiest intermediate station on the line and was the terminus  until 31st August 1886 when the line extended to Cardigan.  Before the extension opened busses met two of the daily trains to take passengers on to Newport. After the extension opened there was still a bus service to Newport. Although the station served the village of Crymych Arms (also sometimes shown as just Crymych on maps) the spelling of the station was always Crymmych. Some later Ordnance Survey maps showed the village as Crymmych Arms but modern maps show it as Crymych.  Other than the Crymych Arms public house, which remains open to this day, little   had existed at the spot before the coming of the railway. The community,   however, grew rapidly as a service and transport centre for the surrounding   uplands and acquired a reputation for being 'the Wild West of west Wales'
 The original station was very basic but more substantial than others on the line and included a refreshment room. Initially there was probably only one platform and a run round loop. The station was rebuilt and enlarged in 1887 and at this time the refreshment room closed.  The new station had two platforms, the main stone built station building which included a large two storey stationmaster's house, booking office, waiting rooms, offices and toilets was on the up platform with a small canopy stretching between two projecting wings of the building. The gents toilets were at the south end of the building. The stone built goods shed backed onto  the down platform with a wide canopy across the width of the platform. At the south end of the goods shed was a timber fronted waiting room with a small canopy.
 
 A signal box on the down platform towards the south end controlled the  goods yard with two sidings on the down side running behind the station buildings and a shorter siding on the up side. There were also cattle pens, a cattle dock on the down side. As well as livestock the station handles large quantities of coal and fertiliser. When the line closed to passenger traffic the yard remained open for goods traffic until 27th May 1963. After that date the station remained open as a non rail connected goods depot until 26th October 1964 when it was downgraded to an unstaffed coal depot, finally closing on 5th April 1965. The last member of staff left the station in November 1964.
 During WW2 a pillbox was built against the wall of the station house, this was still there in the 1960s. There was also a well on the up platform with cold water available for passengers, A GWR cup was provided. In later years Crymmych Arms was the only intermediate station that still had a station master. 
 BRIEF HISTORY OF THE WHITLAND & CARDIGAN RAILWAY
 In 1845 there was a proposal  to build a branch line from Carmarthen to  Cardigan at the mouth of the River Taf as part of the planned Great North and  South Wales & Worcester Railway; nothing came of this scheme. In 1854 the  Carmarthen and Cardigan Railway was formed with the intention of building a  broad gauge line from the South Wales Railway at Carmarthen  to Newcastle Emlyn and Cardigan, together with a deep water port at Cardigan.  The SWR had opened their line form Chepstow to Swansea  in 1850, extending to Carmarthen in 1852 with  the intention of eventually reaching Neyland.
 
                    reached Cardigan.
                      |  | Construction started in 1857  and by September 1860 it had reached Conwil Elfed; it took a further four years  to reach Llandysul. Due to financial difficulties this was to remain the end of  the line for another 31 years before the link to Newcastle Emlyn was completed  by the Great Western Railway; but the line, which had been converted to  standard gauge in 1872, never  |  During the 1860s, mine and  quarry owners along the Taf Valley realised that the troubled C & CR would be  of little benefit to them even if it did ever reach Cardigan. Their best  interests would be served by a line running south from Cardigan along the  valley. To achieve this aim, the proprietor of Glogue Slate Quarry spearheaded  the promotion of the standard gauge Whitland & Taf Vale Railway, which would  provide a better outlet for the slate and minerals of the valley. The proposed  line would run from Whitland on the SWR (part of the GWR since 1862) to Crymmych, on the main road between Cardigan and Haverfordwest. Engineer James W  Szlumper was employed to draw up plans for the line ready to put before  Parliament. There was a lot of local  support for the line, and the promoters had little difficulty raising  sufficient capital.  At this time the SWR  was still broad gauge so, to enable trains to run into Whitland, the new  company had to negotiate with the GWR to lay mixed gauge track to its junction  with the W & TVR, 2’/4 miles west of Whitland. 
                    
                      |  | The Whitland and Taff Vale  Railway Bill was unopposed and was passed by Parliament in 1869, and in the spring  of 1870 the company started negotiation to acquire the necessary land. Much of this  was owned by the church, and some of the landowners were making such exorbitant  demands that the project was almost abandoned. Eventually agreements were  reached and a contractor, Edward Lewis, was appointed on 13th October 1870.  Lewis undertook to build the single-track 14¼ railway to James Szlumper's  specification for £8,700.  Construction started on 8th  November 1870 and, despite bad weather, there was rapid progress. Five miles of  earthworks had been completed by February 1871, and it was anticipated that  mineral traffic to Glogue would be possible by 1st May that year, and to Crymmych  by the summer assuming that the GWR completed the junction with their line;  this didn't happen until June 1871. By now the company was in  financial difficulty and raised further capital by offering unsold shares at a  reduced rate to existing shareholders, with any remaining shares being offered  to the public.  Work then proceeded  steadily, and by August 1872 the line was ballasted from the junction to  Llanglydwen .It was anticipated that on completion of ballasting to Glogue six  or eight weeks later the permanent way would be ready for light traffic. The  company was hopeful that the line would be ready for heavy goods traffic by  November that year, and the rolling stock was ordered and staff appointed. |  Completion of the line was  further delayed due to deliberate vandalism and a dispute with the GWR over delivery  of rails and fishplates, and once again the company was in financial  difficulties with payments to the contractor being in arrears. At a board  meeting on 11th February 1873, Edward Lewis, was asked to hand over the line,  including the sections that were unfinished; he eventually complied, and on 1st  March 1873, although the arrears had still not been cleared, work restarted. The junction was examined by  the Board of Trade on 15th March. Once a few improvements had been made the  line was officially opened for goods and mineral traffic on 24 March 1873, with  two daily trains between Whitland and Glogue quarries calling at all  intermediate stations: Llanfalteg, Login, Llanglydwen, Rhydowen and  Llanfyrnach.  Following the departure of  Edward Lewis - who had to resort to legal action to get at least some of his money  - the company was forced to take on the remaining work itself, employing the  existing workforce to complete the line to Crymmych, which opened to goods traffic  in July 1874.  Steady progress was made to bring the line up to the standard  required to carry passengers, and on 29th May 1875 the Board of Trade was  notified that the line would be ready for final inspection two weeks later. An  inspector was appointed, but he failed to turn up within the ten day period  provided by statute. Having received no communication from the Board of Trade,  the line opened to passenger traffic on 12th July 1875 without an inspection.  Initially there were four  down trains (northbound) and three up trains a day with a journey time between  Whitland and Crymmych Arms (the station at Crymmych  was always known as Crymmych Arms) of between 1 hour 10 minutes and 1 hour 30 minutes.  A connecting road service to Cardigan met two of the trains.  
                    Board of Trade had powers only  to recommend works and not to compel them. .
                      | The line was eventually  inspected three days later, and the company was informed that it must suspend  the passenger service for one month to allow the required modifications to be  carried out. The directors ignored this directive, stating that it had acted  within the law as the inspector had failed to turn up within the specified  period, and that once a line had been opened the |  |  Early traffic receipts were  encouraging with a dividend of 3% on ordinary shares in the second half of 1875. In 1876 James Szlumper drew  up plans for extending the line to Cardigan, and, after some initial caution, the  directors agreed to seek parliamentary approval. The Whitland & Taf Vale  (Cardigan Extension) Railway Act was passed in 1877, and the company then became  known as the Whitland & Cardigan Railway.   At this time the directors were aware that eventually their line would  probably become part of the GWR. Although reluctant to start  work until sufficient finance was available, the board could not resist an offer  of cheap rails, and on 22nd April 1878 they agreed to start work immediately at  both ends.  Due to difficulties buying  all the land work did not in fact start until August that year. Progress was slow following  disagreements between Szlumper and the company; eventually all construction  stopped, and Szlumper was dismissed. A new engineer, J B Walton, was appointed,  and limited work on the extension restarted, but serious financial difficulties  inhibited progress, and the company entered into negotiations with the GWR to  take over the running of the line. After protracted negotiations the GWR agreed  to work the line for 70% of receipts in the first year, and a new Bill was put  before Parliament in August that year to facilitate the agreement between the  two companies and authorise a new route between Boncath and Cilgerran. In 1878 it  was decided to relay the entire line with a heavier rail, and the GWR agreed to  contribute towards the cost of this; by now take over by the GWR was generally  expected. 
                    
                      |  |  Once purchase of the  necessary land had been completed, construction of the Cardigan extension began  in earnest on 1 May 1883 and went ahead rapidly. The permanent way from Crymmych  to Boncath was completed in August 1884 reaching Cardigan a year later. No  authority had been granted to run a passenger service, but a special excursion  from Cardigan to Tenby was arranged, with the first passenger train running in  and out of Cardigan on 10th August 1885, although the opening of the extension  was still over a year away.  By the end of 1885 take-over  of W & CR. services by the GWR on the completion of the Cardigan Extension  Railway was believed to be imminent. There was local outrage when the GWR  announced that the stations at Login, Rhydowen and Glogue would close to  passenger traffic within a year of taking over the line, if passenger receipts  did not improve. 
                    the line from 1st September 1886. The station in fact  opened on 31st August 1886; this was only the second time the W & CR  operated the service into Cardigan, which was handed over to the GWR that  evening. Additional intermediate stations were opened at Boncath and Kilgerran.  Although the extension was already open the official opening ceremony was held  the following day.  Under the 1883  agreement all existing rolling stock was handed over to the GWR.
                      |  | In July 1886 notice was given  to the Board of Trade that the Cardigan Extension was ready for inspection.  This took place on 29/30 June despite the fact that there was still unfinished  work at Cardigan station. Inevitably the inspector postponed the opening of the  line for one calendar month from 6 July to allow this work to be completed. The  GWR agreed to operate |  By this time, both passenger  and goods traffic was in decline. Although the Glogue quarries were still  profitable, agricultural traffic - which was the main business of the line -  was in decline. There had been a disastrous slump in lead prices between 1876  and 1885, and Llanfyrnach mine closed in 1890. Glogue Quarry remained in  operation until March 1926, when it too closed. It came as no surprised when  the W & CR was finally absorbed into the Great Western Railway with effect  from 1st July 1890. The earlier threat of station closures was never carried  out, and all stations remained open until final closure of the line. For the  next 70 years the line settled down to a quiet and eventless existence.  Crymmych developed as one of  the important agricultural centres of west Wales and was the busiest intermediate  station on the branch. A 'Cattle Special' ran from Carmarthen Junction to  Crymmych on the last Tuesday of each month to serve the cattle, horse and sheep  fair. There was also a good trade in rabbits from stations on the line. 
                    from Burton-on-Trent. At Cardigan the sidings were  often crowded to capacity, especially with coal wagons and vans of fertilisers.  Even if the passenger trains were not full local people felt that the freight  was enough to make the railway profitable, which was probably true before WW2.
                      | The GWR maintained a freight service of two  trains a day in each direction on weekdays, and one each way on Saturdays.  In the war years extra trains were run, but  on an ‘as required’ basis. The railway was generally busy. Crymmych handled  large quantities agricultural machinery, animal foodstuffs and coal, and every  Monday a consignment of beer was received |  |  On 1 January 1948, the  Cardigan branch of the GWR. became part of the Western Region of the nationalised  British Railways. In the period of BR ownership the passenger service consisted  of four down and three up trains. The trains called at all the intermediate  stations; latterly Llanfalteg, Login, Rhydowen, Glogue and Kilgerran were  downgraded to 'halts'. Of these only Kilgerran became unstaffed; at the rest at  least one person was required to deal with level crossing gates. Post war freight traffic was  almost as varied as ever. Coal and fertilisers were conveyed to Llanfyrnach,  Crymmych and Cardigan. At Kilgerran and Boncath the business was largely timber,  and at Llanglydwen it was coal. A lot of milk went by rail, and although there  was some decline in cattle traffic even in the late 1950s, plenty of cattle  wagons were to be seen at Crymmych. In spite of this volume of goods traffic,  and some steady custom in passengers from villages devoid of any other public transport,  it became obvious in the 1950s that the days of the railway were numbered as  the popularity of the car increased. Cardigan was still quite a  popular destination for tourists in the summer months, but this generated insufficient  traffic to make the passenger service viable along the steep and winding line,  which took its toll on the locomotives and rolling stock.  The line had a remarkable number of tight curves along its route - few branches   in Britain could match it and progress along the branch was always slow.  In 1961 the first passenger train of the day from   Whitland to Cardigan managed a breathtaking average speed of about15 mph. There were seven  level crossings, all of which had to be manned, and signalmen or goods yard  staff were needed at Llanglydwen, Crymmych, Boncath and Cardigan. It therefore  came as no surprise when, in February 1962, British Railways submitted  proposals for the closure of the line to the Transport Users’ Consultative  Committee. There was little opposition, and closure was approved: passenger  services were withdrawn on 8th September 1962, at the end of the summer  timetable. In the weeks up to closure  the line was busy and on the last day there was a large crowd eager to travel  on the final train, including one passenger who had been on the first official  train into Cardigan in 1886. About 500 passengers were crammed into the last service  out of Cardigan.  A new bus service  started the following Monday, calling at all the intermediate stations.  Even this unprofitable and was withdrawn  after three years. The line remained open for  freight traffic with a reduced service of one train in each direction on a  Monday and two trains Tuesday - Friday. Cardigan shed was closed, and the halts  at Llanfalteg, Login and Rhydowen were closed completely with trains only  stopping at Glogue to take on water. Parcels traffic was also withdrawn from  Llanglydwen, Llanfyrnach and Boncath. Most of the staff were  retained at Crymmych and Cardigan, but this was to be short-lived as the  freight service was withdrawn completely from 27th May 1963. One or two trains  ran over the line after that date to collect materials and to clear wagons. The  last man employed on the line by British Railways left Cardigan in November  1964. Track lifting operations began in December 1963 and were completed by  July 1964. Through the 1960s the land was disposed of, mostly to local farmers  or other adjoining landowners. Sources: The Whitland & Cardigan Railway by M R C Price published by the Oakwood Press 1976 and 1986 ISBN 978-0853614098 Tickets from Michael Stewart, route map drawn by Alan Young, To see other stations on the Whitland & Cardigan Railway click on the station name: Whitland, Llanfalteg, Login, Llanglydwen, Rhydowen, Llanfyrnach,Glogue, Boncath, Kilgerran & Cardigan
 |