Station Name: CHRISTOW

 

[Source: Dave Holman]



Date opened: 12.7.1903
Location: On the north side of an unnamed minor road (to Doddiscombsleigh)
Company on opening: Exeter Railway Company
Date closed to passengers: 9.6.1958
Date closed completely: 1.5.1961
Company on closing: British Railways (Western Region)
Present state: The station is now a private residence. The platforms are extant but the track bed between them has been infilled and a lawn planted.
County: Devon
OS Grid Ref: SX839865
Date of visit: August 1969 & March 2006

Notes: Christow had two platforms and was the only passing place on the line until 1943. The main station building was on the up platform built of red brick with a hipped roof. The down platform had a waiting shelter also with a hipped roof and at the far end of the platform was a raised timber built signal box. When Christow was the terminus of the original line from Heathfield it was called Teign House and during this period there was an extension for loading stone known as Teign House Siding.

Two sidings were added behind the down platform in 1914 for Scatter Rock Quarry traffic and a 3/4 mile siding curved sharply away to the Bridford Quarry of the Devon Bassalt and Granite Company in use between 1910 - 1931. The Bridford Barytes Mine also used the railway at Christow conveying Barium Sulphate to Exeter for milling; this traffic ceased in July 1958.

The down loop was extended northwards by 370 yards in 1943 as part of the upgrading of the route for diverted trains. Although officially closed to freight traffic on 1.5.1961, the station could not be used by rail bourne traffic after 30.9.1960 after the line was cut by floods.

The sidings are now the home to The Exeter and Teign Valley Railway. They have a Toad brake van that has been converted for sleeping accommodation.

BRIEF HISTORY OF THE TEIGN VALLEY RAILWAY
The Teign Valley Line was originally authorised in 1863 as a broad gauge line, although it did not open until 1882. The line ran as standard gauge from Heathfield to Ashton, although it was isolated from the GWR system as the Moretonhampstead line at Heathfield was still broad gauge.

Some forty years later, the Exeter, Teign Valley and Chagford railway was formed to build a line from Exeter to join up with the existing line connecting at Christow station. This opened on 1st July 1903 some 9 years after the first sod had been cut by Lady Northcote, wife of the Member of Parliament for Exeter on 7th November 1894. The 1st official train left St Thomas station (Exeter) at 3.40pm and arrived at Ide at 4pm calling at all the stations on the line where each parish council laid on festivities and the usual address by councilors.

The line which extends from Heathfield on the Newton Abbot to Moretonhampstead line in the south to Exeter on the main London to Cornwall line covers a total of 17 miles. It consists of approximately 25 bridges, 30 culverts and 2 tunnels, one each side of Longdown station. These tunnels were built to hide the offensive sight of the trains from Edward Byrom of Culver House which stands in parkland above the railway.

The largest customer for goods traffic on the line was the Teign Valley Granite Company which had quarries at Trusham and Crockham. Not only was the line used for local connections but it also provided an alternative route to Cornwall,  bypassing the troublesome route from Exeter to Newton Abbot which regularly (and still does) suffered from the elements from the sea around Dawlish

Prior to the opening of the through line in 1903, passenger services on the original line consisted of 5 trains daily in each direction on weekdays only, with no trains at all on Sundays. When the line opened from Exeter the passenger service was integrated with that of the Teign Valley Railway. The Exeter Railway and the Teign Valley Railway were both absorbed into the Great Western Railway in 1923.

Passenger numbers reached their peak in the 1930’s with seven daily services provided each way between Exeter and Heathfield. During World War 2 this was reduced to four trains in each direction, still with no trains on a Sunday. This was increased to five daily trains after the war.

By then it was becoming obvious that the branch was going into decline as more people took to the motor car as their main form of transport, a trend that was happening nationally. As a result BR decided to withdraw passenger services a full 5 years before the start of the ‘Beeching Axe’, even though Ashton station had only been repainted the year before closure.

In 1957 The British Transport Commission proposed to withdraw the passenger train service between Exeter (St David’s) and Heathfield and to close down Longdown station. It was followed in early 1958 by a further notice saying that as from 3rd March 1958 that the passenger train service between Exeter (St David’s) and Heathfield stations would be permanently withdrawn and Longdown, Alphington, Ide, Dunsford and Chudleigh Knighton would be closed for passengers and goods. The parcel service would still continue for the delivery and collection of parcels at Chudleigh, Trusham, Ashton and Christow stations. The line was granted a short reprieve by a protest by St Thomas Rural District Council (Exeter) because of the inadequate bus service, this reprieve was short lived as on 9th June 1958 the passenger service was finally withdrawn and the section of line from Exeter to Christow closed completely.

The track on this section was lifted in February 1962 except for the short length from Exeter to Alphington Road sidings (Marsh Barton Industrial estate). This part of the line still survives today, serving a scrap metal company and this is still used regularly (2010), beyond here towards Heathfield the line has been severed by a supermarket.

BR's reasoning behind the closure was the line was only used for an average of 193 daily journeys and closure would give them a saving of £15,000 per annum with a further saving of £30,000 that would be required for general up-keep of the line.

March 1961 saw flooding which damaged the line between Christow and Ashton resulting in the closure of the line east of Trusham. BR officially closed the section of line between Heathfield and Crockham sidings (just south of Trusham) on 1st July 1968.

Further reading: The Heathfield to Exeter (Teign Valley) Railway by Lawrence Pomroy - Forest Publishing 1995 ISBN 1 873029 04 7
Teign Valley Line by Peter Kay - Wild Swan 1996 ISBN 1 874103283
Branch Line to Moretonhampstead (including Heathfield - Exeter) by Vic Mitchell & Keith Smith
Middleton Press 1998 ISBN 1 901706 273
Walking West Country Railways by Christopher Somerville - David & Charles 1979
ISBN 0 715381421
Devon's Railways by Helen Harris - Bossinney Books 2001 ISBN 899383 40 9
Branch Lines of Devon by Colin Maggs - Sutton Publishing 1995 ISBN 1 84015 022x

To see other Stations on the Teign Valley Railway click on the station name: Heathfield, Chudleigh Knighton Halt, Chudleigh, Trusham, Ashton, Dunsford Halt, Longdown, Ide Halt & Alphington Halt


Christow Station looking north in c.1906
Copyright photo from John Alsop collection





Christow Station looking north in August 1969
P
hoto by Nick Catford


Christow Station looking north in March 2006
Photo by Dave Holman




Click on thumbnail to enlarge

 

 

 

[Source: Dave Holman]


Home Page
Last updated: Wednesday, 17-May-2017 09:11:00 CEST
© 1998-2007 Disused Stations